Thursday, May 3, 2012

First Upgrade To The Flash...

One of the things that I wanted to do right away to the Flash was to drop the 44T chainring on the front, add a bashgaurd and run it as a 2X10. Seeing as I already had a Sram X-9 2X10 set in my garage all I needed was a bashguard. Brian over at EP/BC ordered me an awesome bashguard and that was it, after a shifter and front derailleur change I was set! Here is a pic! I am pretty happy with the bike and its performance. I also got all this done just a day before my first of only two races that i am doing this season. Very soon I will do a write-up about the first race, the Greenbrier Challenge and in a few days i have the other race to be followed by a post.



No comments:

Post a Comment

I want to hear back from you...!